Picture this scene at the network operations centre:
Friday night, 4:45. The call comes in, “Hey Joe, looks like the 48 volt router on our Signal Hill site has locked up, get in the truck and get up there and do the reset”. (more…)
Picture this scene at the network operations centre:
Friday night, 4:45. The call comes in, “Hey Joe, looks like the 48 volt router on our Signal Hill site has locked up, get in the truck and get up there and do the reset”. (more…)
Posted in DC Power Distribution | Comments Closed